RCS Group were chosen by Woolloongabba based company Stirloch to assist them with this $22m infrastucture project for Lismore city Council. The overall project involved the augmentation of the existing plant to cater for a 2026 design horizon equivalent population (EP) of 25,000 EP.  Stirloch is the Principal Contractor for the Design & Construction performance based specification which includes all aspects of the treatment plant from design to Proof of Performance Testing (PoPT).  The project includes a new elevated concrete inlet works , IDEA Reactor, Digesters, Sludge Dewatering facility incorporating a belt press, conveyors  and sludge bin. Lime clarifiers, Tertiary treatment incorporating UV and cloth filters, odour control facility, administration building, control building, blower building, all pipework roadworks, electrical work and control systems.

RCS Group involvement was to provide surveying services for Engineering Setout in order to maintain the integrity of the construction works.

Project Details

Date15-08-2017

Related works

Layout mode
Predefined Skins
Custom Colors
Choose your skin color
Patterns Background
Images Background